08752, Power Unit Change, Margam Depot, 2009
On the penultimate day of the official closure of Margam Depot, 08752 underwent a power unit change using the engine block from scrap 09003 and a reconditioned generator from Ferrybridge. The power unit change was carried out using Margam Depot's 75 Ton Cowans Sheldon Crane manned by a supervisor, crane driver and four slingers. The power unit from 09003 was removed some weeks earlier and its defective generator was changed for the recoditioned one prior to 08752 arriving at Margam Depot.
Click on a thumbnail to view the large image and click on ← to return to this page
08752 Margam Depot 30th July 2009
09003 Margam Depot 30th July 2009
08752 Margam Depot 30th July 2009
08752 Margam Depot 30th July 2009
75 Ton Cowans Sheldon Crane Margam Depot 30th July 2009
08752 08752 & 09003 Power Unit 08752 Cowans Sheldon 75T crane
75 Ton Cowans Sheldon Crane Margam Depot 30th July 2009
Cowans Sheldon 75T crane 08752 09003 09003 Cowans Sheldon 75T crane
Cowans Sheldon 75T crane Cowans Sheldon 75T crane Power Unit Cowans Sheldon 75T crane Cowans Sheldon 75T crane
         
      Last Updated, 18/04/09